Skip to content

Second Turbine Travels to Point Lepreau

After falling into the harbor, two trips to the U.K. and back, two huge turbines for the refit project at Point Lepreau are almost done travelling. The second was loaded onto a barge this morning and will arrive at the generating station by the end of the day. The first arrived on Tuesday.

No word on when they will be installed at the plant.

Do you have a news tip?

Submit to NBNews@radioabl.ca.

loader-image
May 11, 2026
weather icon 16°C
L: 16° H: 16°

What’s Trending