Drivers in Saint John can expect some delays at the Harbour Bridge Tuesday night.
Two full closures of the bridge will take place between 6 and 10 p.m.
The closures should last about 20 minutes each and are necessary for jacking operations.
In preparation for the work, the Department of Transportation and Infrastructure is advising traffic will be reduced to one lane in each direction.
That is scheduled to begin at 3 p.m.
-
View all postsBryan Tait is an award-winning journalist based in New Brunswick. He’s a 2008 graduate of St. Thomas University’s journalism program, and a 2021 graduate of the University of New Brunswick’s law program. Contact Bryan at taitb@radioabl.ca.




